Office Decommissioning in Airoli, Ghansoli and Mahape: A Timeline

Navi Mumbai Scrap · Updated 2026-10-10

Decommissioning an office floor in Airoli, Ghansoli or Mahape usually takes six to eight weeks from the exit decision to handover. The tight parts are building approvals, goods lift slots, after-hours work windows and the landlord's reinstatement list. Navi Mumbai Scrap buys furniture, cabling and fit-out metal, works night and weekend slots, and quotes the clearance as one net figure.

Short answer: Decommissioning an office floor in Airoli, Ghansoli or Mahape usually takes six to eight weeks from the exit decision to handover. The tight parts are building approvals, goods lift slots, after-hours work windows and the landlord's reinstatement list. Navi Mumbai Scrap buys furniture, cabling and fit-out metal, works night and weekend slots, and quotes the clearance as one net figure.

Why IT park exits need a timeline

The Thane-Belapur Road corridor through Airoli, Ghansoli and Mahape is lined with IT parks and tech campuses. Exiting a floor in one of these buildings is not like closing a small office. Facility management controls the loading bay, the goods lift and the hours you can work. The landlord has a reinstatement list. Your IT team has data to secure. Miss one approval and the crew stands at the gate.

The timeline below is a practical template. Shorten it if your lease end is near, but keep the order.

Eight weeks out: decide and inventory

  • Confirm the handover date and the landlord's reinstatement requirements in writing: bare shell, warm shell or as-is.
  • Build an asset list by category: workstations, chairs, cabins, storage, ACs, server racks, UPS, cabling, pantry, signage.
  • Mark what moves to the new office, what goes to another branch, and what is surplus.
  • Ask finance which assets are on the fixed asset register so write-offs can be recorded.

Six weeks out: approvals and quotes

  • Request the building's move-out and contractor work permit process from facility management.
  • Share photos or a walkthrough video with clearance vendors and ask for a single net figure for surplus items.
  • Get the building's rules on noise, hot work and debris in writing.
  • Decide how e-waste will be routed. If your company is a bulk consumer, read our post on bulk consumer e-waste rules before selling any IT equipment.

Four weeks out: IT and data

Your IT team should remove or wipe storage from every laptop, desktop, server and printer before anything leaves the floor. We do not offer data destruction services or certificates. Drives your security policy requires to be destroyed should go through your own IT asset disposal process.

Once storage is handled, network switches, patch panels, cabling and server racks can be listed for sale. Racks and cable trays are priced as metal. Copper data and power cabling is weighed; indicative ranges are on our scrap rate page.

Two weeks out: book the windows

  1. Book goods lift and loading bay slots, usually after 8 pm or on weekends in most parks.
  2. Send crew names, ID details and vehicle numbers to facility management for gate passes.
  3. Confirm PPE and safety induction rules for the contractor crew.
  4. Agree the sequence: movers take the keep items first, then the clearance crew takes the surplus.

Clearance week: what happens on the floor

Workstations are dismantled into panels, frames and worktops. Chairs are stacked. Cabins and partitions come down where reinstatement requires it. Ceiling-level cabling is pulled where the landlord wants it removed. ACs are uninstalled by your HVAC vendor or our crew, depending on the building's rule. Everything is moved through the goods lift in the booked window and loaded straight onto the vehicle, so corridors stay clear for other tenants.

A typical 100 to 150 seat floor is cleared over one or two nights. Larger floors, or those with full cabin build-outs and raised flooring, take longer. Facility management usually inspects the corridor and lift lobby the next morning, so the crew sweeps and checks both before leaving.

How the price works for an office floor

Item group Usual pricing
Copper cabling, ACs, UPS units Weighed or per unit, with value
Metal storage, racks, workstation frames Weighed as metal
Chairs, cabins, laminate worktops Lumpsum, often low or no value
Labour, dismantling, after-hours work Offset against the above

The result is one net figure. On floors with plenty of cabling and ACs we usually pay. On floors that are mostly laminate furniture, a clearance charge may apply. Either way, the number is fixed before the work starts.

Handover day

Walk the floor with facility management, photograph every room, and collect the work completion sign-off. Keep our numbered receipt and the material handover note for your finance and admin records. If you also have smaller branches to close, our branch decommissioning checklist covers them.

Where IT park exits usually slip

  • Late permits. Facility management often needs several working days to issue contractor passes. Apply early.
  • Lift clashes. Another tenant may be moving in the same weekend. Confirm your slot in writing.
  • Unclear reinstatement. If the landlord adds items at the joint inspection, the crew has to come back. Walk the floor with the landlord before clearance, not after.
  • Leased equipment mixed with owned. Rental printers and water dispensers must go back to the vendor. Tag them before the crew arrives.
  • Storage not cleared. If one laptop still has its drive, the whole batch waits.

A one-page plan for leadership

Week before handover Owner Milestone
8 Admin Asset list and reinstatement scope
6 Admin and facility Permits requested, vendor quotes in
4 IT Storage removed or wiped
2 Admin Lift slots and gate passes confirmed
1 Vendors Moving and clearance done
0 Admin and landlord Joint inspection and sign-off

Get a net figure for your floor

Admin and facility teams can WhatsApp 9594999512 with a walkthrough video and the handover date. We work in parks across Airoli, Mahape and Ghansoli every week. See our office decommissioning page for the full service.

Office Decommissioning in Navi Mumbai

Frequently asked questions

Can you work only at night?

Yes. Most IT park clearances run after hours or on weekends, within the building's permitted window.

Do you remove partitions and false ceilings?

We remove partitions, cabins and cabling where the landlord's reinstatement list asks for it. Civil debris such as broken gypsum and tiles is not accepted.

Do you issue a data destruction certificate?

No. Storage should be wiped or removed by your IT team, or routed through your own IT asset disposal process, before handover to us.

Can one vendor handle both moving and clearance?

We handle the surplus. Your movers handle what goes to the new office. We coordinate timings so the two crews do not clash.

What if the exit date moves?

Tell us as soon as the landlord confirms a new date. We hold the agreed net figure for the same scope and simply reschedule the crew and lift slots.